Joy Riders USA

Tweetsie Trail

Tennessee · Rail-trail

Tennessee’s signature long gravel rail-trail, connecting two downtowns across seven bridges on a forgiving grade.

Open this ride in the finderDirections

Plan your ride

Location
Johnson City → Elizabethton · Tennessee
Ride length
9.5 mi
Ride format
One way / out & back
Surface
Compacted crushed stone
Road crossings
The grade is gentle; crossings become more urban toward Elizabethton, and gravel favors wider tires.
Elevation
Gentle rail grade
Starting location
Tweetsie Trailhead, 107 Alabama St, Johnson City, TN

completed rail-trail between both cities

Existing Tennessee simplified route; verify the listed entrance.

Tweetsie — Alabama / Legion public head: short bicycle return — detailed guide

Source review: 2026-10-21. A dated source review does not guarantee current-day conditions.

Johnson City, Tennessee · Up to 4 miles return · Packed-rock improved main rail trail

Start: Tweetsie — Alabama / Legion public head, Corner of Alabama and Legion streets, Johnson City, TN. Current city recreation facility explicitly identifies paved public parking at this main head. Walk from designated spaces to the main packed-rock course. Ballpark / East State of Franklin overflow requires a different street / sidewalk approach and is excluded. Use designated ordinary visitor spaces, respect reserved spaces and walk through the lot to the signed main path. The address identifies a public facility, not a surveyed stall.

Ride: Follow the signed main path toward Elizabethton on the main rail trail. Turn after 2 outward miles or before the first public-road crossing, work barrier, uncertain continuation or uncomfortable transition, whichever comes first; retrace. Walk any initial lot or access-drive interface. Do not use a road or private-property detour.

Distance: Chosen 4-mile maximum return, not the full regional corridor or a surveyed parking-to-parking distance. Earlier interfaces shorten the outing; parking walking is extra.

Permission and effort: Source-backed ordinary bicycle use on the designated improved main path; walking-only spurs and adjacent private property are excluded. City describes gradual tread. That is qualitative, not surveyed maximum slope or an all-weather firmness promise. Walk awkward aggregate / bridge transitions and shorten if uncomfortable.

Planning: City facility lists 7 a.m.–7 p.m. daily; choose daylight within posted local gate / parking terms. No current ordinary access tariff established; posted terms govern. Event, camping and rental charges are separate. Yield to walkers and horses where present, keep right and announce passes. Obey posted speed, helmet and pet requirements. Ordinary pedal bicycles covered here; no blanket e-bike-class permission inferred.

Access reviewed October 20, 2026 Central (October 21 UTC): Fresh city facility body confirms main course and listed amenities. Portable toilets / fountains are listed services, not promised operational on arrival. A 2024 shop-restroom lease approval does not establish unrestricted shop parking or activated facilities. Natural Tannery Knobs trails are separate. This is a dated source review, not a field inspection or current-day all-clear. Postpone for snow, ice, high water, soft tread or barriers rather than improvising a bypass.

Bring water and choose suitable weather. Parking walking is extra. No surveyed parking-space pin or navigable GPX is supplied.

Sources: City current bicycle course / public parking / qualitative effort · Retained city public facility reference, not stall pin

Manager information

Visit Johnson City

More rides in this state